Archive for March, 2014

There are 4 results found

Project Curacao Installed

Today was the big day.  We mounted the Project Curacao wind turbine (here on Amazon) and the box up on the tower.  March 13, 2014. It’s running fine.  You can see the graphs and latest picture on http://www.milocreek.com/projectcuracaographs.  Thank you […]

Project on Site

All of our equipment has arrived here on the island.  TSA inspected the box twice, but aside from picking up the box with the outside temperature sensor, pulling the wires off, it survived.  The temperature sensor was fixable.  There were […]

%d bloggers like this: